scott d tyson ltd
  • Welcome
  • Dream Kitchens Bathrooms Renovation Before & After Smaller Projects Basements
  • Contact
scott d tyson ltd
  • Welcome/
  • Projects/
    • Dream Kitchens
    • Bathrooms
    • Renovation Before & After
    • Smaller Projects
    • Basements
  • Contact/
scott d tyson ltd

additions and renovations

Renovation Before & After

scott d tyson ltd
  • Welcome/
  • Projects/
    • Dream Kitchens
    • Bathrooms
    • Renovation Before & After
    • Smaller Projects
    • Basements
  • Contact/

Kitchen Expansion and Sunroom Addition

Screenshot 2023-01-29 160613.jpg
Screenshot 2023-01-29 160705.jpg
Screenshot 2023-01-29 160059.jpg

Addition and Whole House Renovation in Wayne

View fullsize IMG_0022.JPG
View fullsize IMG_3710.JPG
View fullsize IMG_0035.JPG
View fullsize IMG_0025.JPG
View fullsize IMG_3529 (2).JPG
View fullsize IMG_0047.JPG
View fullsize IMG_0020.JPG
View fullsize kitchen side.JPG
View fullsize IMG_0158 (2).JPG
View fullsize IMG_0162 (2).JPG

Garage Apartment is Transformed with a Dramatic New Roofline

Garage Apt. Before: The Garage apartment was dark and cramped with a sloped attic roof.

Garage Apt. Before: The Garage apartment was dark and cramped with a sloped attic roof.

After: The new shed dormer raised the ceiling height to 8 feet and opened the space for a beautiful new kitchen and expanded bedroom & living areas. The sunsets from the windows are now spectacular.

After: The new shed dormer raised the ceiling height to 8 feet and opened the space for a beautiful new kitchen and expanded bedroom & living areas. The sunsets from the windows are now spectacular.

AFTER: New shed dormer roof line

AFTER: New shed dormer roof line


Whole House Remodel & Screened Porch Addition

IMG_3711.JPG IMG_3713.JPG IMG_3715.JPG IMG_3716.JPG IMG_3718.JPG IMG_3720 (2).JPG IMG_3725 (2).JPG IMG_3727 (2).JPG IMG_3731 (2).JPG IMG_3732.JPG IMG_3734.JPG IMG_3735.JPG IMG_3740.JPG IMG_3741 (2).JPG IMG_3744.JPG IMG_3746 (2).JPG IMG_3746.JPG IMG_3748.JPG IMG_3752 (2).JPG

Scary Master Bathroom Updated to Classic Beauty

Master Bath Before: The toilet was in a narrow dormer alcove & the far corner was wasted space

Master Bath Before: The toilet was in a narrow dormer alcove & the far corner was wasted space

Master bath Before: The space capsule tub that obstructed the entrance

Master bath Before: The space capsule tub that obstructed the entrance

After: The entry was moved to the end wall allowing for a double vanity and full shower. The walls were raised with shed dormers for a standard height ceiling.

After: The entry was moved to the end wall allowing for a double vanity and full shower. The walls were raised with shed dormers for a standard height ceiling.

extra sTORAGE TUCKED INTO END WALL

extra sTORAGE TUCKED INTO END WALL

master bath (2).jpg
20190108_093553[10973].jpg

Cramped Second Floor Office is Transformed into a Spacious Bedroom with Front & Rear Shed Dormers

Second Floor bedroom/office before: The space was cramped with a sloped attic ceiling and little floor space.

Second Floor bedroom/office before: The space was cramped with a sloped attic ceiling and little floor space.

After: The doorway was shifted to the right to fix an awkward staircase CONFIGURATION. This allowed for a landing area at the top of the STAIRS

After: The doorway was shifted to the right to fix an awkward staircase CONFIGURATION. This allowed for a landing area at the top of the STAIRS

During: The ceiling was lifted with double shed dormers for extra head and floor space.

During: The ceiling was lifted with double shed dormers for extra head and floor space.

Finished Room - Adding shed dormers to each side doubled the Usable floor space in this attic bedroom

Finished Room - Adding shed dormers to each side doubled the Usable floor space in this attic bedroom

20180925_124930[4530].jpg
20180925_130623[4529].jpg
20180924_104722[4479].jpg

Master Bedroom

Master Bedroom Before: Low ceilings and sloped walls made the room feel dark and cramped.

Master Bedroom Before: Low ceilings and sloped walls made the room feel dark and cramped.

Master bedroom and bath during: The room was removed down to the knee walls and rebuilt with shed dormers and lots of windows!

Master bedroom and bath during: The room was removed down to the knee walls and rebuilt with shed dormers and lots of windows!

Master Bedroom During:. High Pressure HVAC ducts were added during construction for better air CONDITIONING and heating.

Master Bedroom During:. High Pressure HVAC ducts were added during construction for better air CONDITIONING and heating.

EIGHT FOOT CEILINGS AND A WALL OF WINDOWS INCREASE THE LIGHT AND OFFER A BEAUTIFUL VIEW

EIGHT FOOT CEILINGS AND A WALL OF WINDOWS INCREASE THE LIGHT AND OFFER A BEAUTIFUL VIEW

20190108_092440[10970].jpg
cozy!

cozy!

master during.jpg
20171023_075726 (2).jpg
20190108_093842[10975].jpg
20171124_101151.jpg
20171208_102104.jpg
20190108_093553[10973].jpg

Wardrobe closets and shelves were built into an otherwise empty space around the hall window adjacent to the master bedroom and bathroom. Additionally, the space on the backside of the staircase was opened, framed in, and enclosed with another wardrobe door for extra closet space.



Second Floor Shed Dormers Added after Tree Damage

View fullsize front house before.jpg
View fullsize back porch.jpg
View fullsize back yard.jpg
View fullsize tree side.jpg
View fullsize FB_IMG_1540344914186[6454].jpg
View fullsize tree back.jpg
View fullsize 20181023_134306[6425] (2).jpg
View fullsize 20161102_172025 (2).jpg
View fullsize 20160726_091735.jpg
View fullsize house back view after.jpg
View fullsize 20150911_135906.jpg
View fullsize 20160620_143125.jpg
View fullsize 20160621_135755.jpg
View fullsize IMG_3147[4238].jpg
View fullsize swing.jpg
View fullsize porch swing.jpg
 

Screenshot 2023-01-29 160059.jpg
Screenshot 2023-01-29 160012.jpg
1 2
Previous Next
Screenshot 2023-01-29 160059.jpg
Screenshot 2023-01-29 160012.jpg